News & Events

3/30/2018 – Farr Wast Engineering – Central & South Reno Interceptor Capacity Project

Description: Construction Services installation of approximately 2,500 LF of interceptor sanitary sewer pipe in Kietzke/Linden Street Area. Project Description – Provide the services for which the design professional(s) were selected. Attached extra sheets(s) if required. Including but limited, construction management, construction inspection, construction survey and material testing