Description: This project is to rehabilitate the Nitrification Tower 2 at the TMWRF facility. Project will replace the tower media, center column, arm equipment, and will repair concrete wall panels and joints and provide protective coatings.
1755 E Plumb Lane Suite 258, Reno, NV 89502
Description: This project is to rehabilitate the Nitrification Tower 2 at the TMWRF facility. Project will replace the tower media, center column, arm equipment, and will repair concrete wall panels and joints and provide protective coatings.
The Nevada Board of Engineers and Land Surveyors provides the information and process through which licensing as a Professional Engineer, Professional Land Surveyor, and certification of Engineer Intern and Land Surveyor Intern is possible.