Description: Design the replacement of AHU-8 and provide design additive alternate for AHU-7. Engineering will consist of removal and replacement of old equipment and all associated items, provide balancing, commissioning, electrical, structural, and cost estimating. Engineer will perform field investigation of existing mechanical/hydronic systems for the preparation of their as-built documents.