Description: Removal of existing composite roadway section and constructing new structural roadway section on Ralston St. from University Terr. to 11th st; Sierra Highlands from Idlebury Way to NDOT Row at McCarran Blvd; Ohm Place from Mil St. to 500 ft. south; Design services and construction cost $327,355 included in project cost above. Hammoll Lane from Kietzke Lane to east terminus; Colbert drive from Longley Lane to 250 feet North. There will be curb and gutter, driveway and sidewalk replacement and reconstruction of pedestrian ramps; new permanent pavement markings; storm drain catch basin work and utility adjustments.