1755 E Plumb Lane Suite 258, Reno, NV 89502

Awarded Projects

Awarded Public Works Projects

The Board is required to post certain information related to all public works projects awarded by Nevada government agencies. This requirement is detailed in Nevada Revised Statute 338, resulting from the 2011 Nevada Legislative Session, Senate Bill 268. After the government agency completes the form and emails it to the Board, the awarded project information will be posted on this page. Click here for the form.

Date

10/19/2023

Company

Construction Material Engineers, Inc.

Agency Name

Truckee Meadows Water Authority

Project

Santerra Quilicity 1 BPS

Preference

no
Inspection and testing serivces for Santerra Quilici 1 Booster Pump Station.

Date

10/18/2023

Company

IQC Southwest, LLC

Agency Name

Clark County

Project

Staff Augmentation for QA/IA Testing

Preference

no
Professional Services Contract for Quality Assurance/Independent Assurance Testing and Inspection of Public Work Projects.

Date

10/18/2023

Company

V&A Consulting Engineers

Agency Name

City of Reno

Project

FY24 Flow Monitoring

Preference

no
Professional engineering services related to sanitary sewer flow monitoring.

Date

10/17/2023

Company

CM Works

Agency Name

Washoe County School District

Project

Debbie Smith CTE

Preference

no
Construction management services Previous PO#930151

Date

10/16/2023

Company

Manhard Consulting

Agency Name

Washoe County School District

Project

Galena HS

Preference

no
Regrade near theater wall Provide survey and engineering services for bidding and construction drawings. Project entails drainage for underground water infiltrating the theater area

Date

10/13/2023

Company

Ainsworth Assoc.

Agency Name

Washoe County School District

Project

Various Sties

Preference

no
Review of the current programming and point to point checkout by BCS controls for the facilities.

Date

10/10/2023

Company

Ainsworth Assoc.

Agency Name

Washoe County School District

Project

Nutrition Services

Preference

no
Provide design thru CA to replace steam boilers. Includes removing unused piping and any repair work

Date

10/09/2023

Company

Black Eagle Consulting, Inc.

Agency Name

Washoe County School District

Project

Duncan

Preference

no
Special Inspection Services

Date

10/09/2023

Company

Black Eagle Consulting, Inc.

Agency Name

Washoe County School District

Project

Duncan

Preference

no
Special Inspection Services

Date

10/09/2023

Company

HDR Engineering

Agency Name

Truckee Meadows Water Authority

Project

Washoe Turbine Replacements and Generator Rewinds

Preference

no
Engineering services and feasibility study for Washoe turbine replacements and generator rewinds.

Date

10/05/2023

Company

Keller and Associates

Agency Name

Truckee Meadows Water Authority

Project

Talus Valley BPS

Preference

no
Engineering design services for Talus Valley Booster Pump Station.

Date

10/04/2023

Company

PK Electrical

Agency Name

Washoe County School District

Project

Mendive MS

Preference

no
Replace burglar alarm system Design for an upgraded burglar alarm system at the existing site

Date

10/03/2023

Company

Black Eagle Consulting, Inc.

Agency Name

Carson City

Project

Mills Park Pickle Ball Courts

Preference

no
Black Eagle will be performing a geotechnical investigation and design recommendations.

Date

09/26/2023

Company

NCE

Agency Name

Washoe County School District

Project

Multiple Schools

Preference

no
Survey design drawings bid services and engineering services during construction for pavement rehabilitation at three sites.

Date

09/26/23

Company

HDR Engineering

Agency Name

Truckee Meadows Water Authority

Project

Highland Washoe Bridge

Preference

no
Evaluation of the Highland/Washoe Canal Diversion Access Bridge

Date

09/25/2023

Company

JUB Engineers

Agency Name

City of Reno

Project

Idlewild Pond Rehabilitation

Preference

no
Re-line the ponds at Idlewild Park

Date

09/20/2023

Company

Geotechnical & Environmental Services

Agency Name

Carson City

Project

Mill Pavilion Post Base Repair Materials Testing

Preference

no
Provide construction materials observation and testing services for the project.