Archive for January 2018

Awarded Public Works Projects

Following are notices sent out through the PAL Council. This posting requirement is in SB 268 and is required by the statute effective Oct 1, 2011. Posting of awarded projects is for all public works projects, not just those that have been awarded to firms certified to receive local preference.

Posting of Awarded Public Works Projects by Nevada Government Entities.

Download the Nevada Government Entity Filing of Awarded Public Works Projects for Posting on Board Website form. The government entity will complete this form to have its awarded public works project(s) posted on the Nevada Board of Professional Engineers and Land Surveyors website.

This posting is required by NRS 338, per the 2011 Legislative Session SB 268. Once a completed form is received by the Nevada Board of Professional Engineers and Land Surveyors staff, the awarded project information will be posted on this award page.

Date
Company
Agency Name
Project
Preference
01/29/2018
SB Engineering
Truckee Meadows Water Authority
Northwest Model Calibration and Satellite Systems
no
Description: Model calibration and water facility plan.
01/29/2018
SB Engineering
Truckee Meadows Water Authority
Twin Lakes Pump Station
no
Description: Pump station planning and design criteria evaluation.
01/26/2018
JP Engineering
Washoe County School District
Sun Valley MS Design
no
Description: Sun Valley MS - Fire protection evaluation of Sun Valley MS site. Consultation, investigation, evaluation, and preparation of a report to premitting agencies.
01/25/2018
Odyssey Engineering
Washoe County School District
Mobiles - Overcrowding
no
Description: Gomes ES and Double Diamond ES - Engineering and design for mobile unit relocation from Double Diamond ES to Nancy Gomes ES
01/25/2018
CR Engineering
Washoe County School District
HVAC FCIS Repairs
no
Description: O'Brien MS + Pine MS - Construction administration for scope of work. Replacement of (2) 6.6MMBH boilers, flues, associated heating hot water piping, and controls
01/25/2018
Christy Corporation
Washoe County School District
Spanish Springs MS Design
no
Description: Professional Civil Engineering Services
01/25/2018
Benchmark
Washoe County School District
HVAC FCIS Repairs
no
Description: Picollo - Professional Roof Consulting Services. Review design details and provide comments and recommended revisions.
01/25/2018
Hazard Management Services
Washoe County School District
2017 Roofing - FCIS Repairs
no
Description: Vaughn MS - Consulting services and speciifcation for Vaughn MS roof repair and replacement project. Provide oversignt of roof repair and replacement project.
01/23/2018
Hazard Management Services
Washoe County School District
Backflow FCIS Repairs
no
Description: Reed HS - Professional consulting services for lead work taking place as part of the Backflow Prevention project
01/23/2018
Hazard Management Services
Washoe County School District
2018 Painting FCIS Repairs
no
Description: Lemmon Valley ES - Professional oversight for 24 days - Lemmon Valley ES accoustical ceiling project
01/23/2018
Hazard Management Services
Washoe County School District
2018 Painting FCIS Repairs
no
Description: Lemmon Valley ES - Professional specifications for the Lemmon Valley ES accoustical ceiling project
01/23/2018
Dyer Engineering Services Inc.
Washoe County School District
2018 Grounds FICS Repairs
no
Description: O'Brien MS - Design services for the siteworks improvements project to remove the existing deteriorated concrete retaining walls, flatwork, steps, benches, tree planters and other associated student amenities
01/23/2018
Benchmark Inc.
Washoe County School District
Reno HS Weld Shop
no
Description: Reno HS - Roof consulting services for weld shop
01/23/2018
One Water Consulting
Truckee Meadows Water Authority
Longley Lane Water Treatment Plant
no
Description: Groundwater Utilization Design
01/19/2018
Jensen Hughes, Inc
Clark County Department of Aviation
IH-17-028 T1 CB2 Maintenance Repairs
no
Description: Jensen Hughes, Inc. will provide fire protection consulting services for the T1 CB2 Maintenance Repairs project at McCarran International Airport
01/18/2018
Tri Sage Consulting
Truckee Meadows Water Authority
Nevada State Lands Easements
no
Description: Structure Survey and design legal descriptions
01/18/2018
Kleinschmidt Associates
Truckee Meadows Water Authority
Washoe Hydroelectric Feasability Study
no
Description: Engineering services for study and design
01/18/2018
Kleinschmidt Associates
Truckee Meadows Water Authority
Chalk Creek Hydroelectric Feasability Study
no
Description: Engineering services for study and design
01/17/2018
Diversified Consulting Services
City of Las Vegas Public Works
Gowan North - El Capitan Branch, Lone Mtn to Ann
no
Description: Construction management services for the design and construct of 5500' of RCB flood control facility within El Capitan Way.
01/17/2018
Pezonella Associates Inc.
Washoe County School District
HVAC Boiler Replacements
no
Description: Pine MS + O'Brien MS - Professional consulting services to conduct required special inspection and construction testing.
01/17/2018
Hazard Management Services
Washoe County School District
HVAC Boiler Replacement
no
Description: Pine MS + O'Brien MS - Professional consulting services for the stabilization of lead painted surfaces in the boiler rooms.
01/17/2018
Ventura Consulting
Washoe County School District
Wild Creek HS Design
no
Description: Professional facilitation of partnering workshops during the design phase of Wildcreek HS CMAR
01/17/2018
PK Electrical
City of Reno
TMWRF Top Deck Lighting Rehabilitation Project
no
Description: Design of new top deck lighting and appurtenant support facilities.
01/17/2018
CR Engineering
City of Reno
TMWRF Heat Loop Preliminary Design Report
no
Description: The project includes the development of a preliminary design report that provides rehabilitation recommendations for the Truckee Meadows Heat Loop System
01/16/2018
TriSage Consulting
Truckee Meadows Water Authority
Glendale Water Supply Rehabilitation
no
Description: Engineering and design support of rehabilitation improvements
01/16/2018
One Water Consulting
Truckee Meadows Water Authority
Glendale Diversion Repairs
no
Description: Engineering and design support of rehabilitation improvements
01/10/2018
Atkins North America, Inc.
Clark County Public Works
Constrcution of the Muddy River Logandale Levee, in Logandale, Nevada.
no
Description: The work includes; site clearing, removal of existing earthen levee, scarification, excavation, over-excavation, grading, de-watering, etc. Atkins North America will provide construction managment services in the project as a representative of Clark County Public Works.
01/08/2018
Slater Hanifan Group, Inc.
Regional Planning Comission of Southern Nevada
Design Services for vacant Sunset Maintenance Faciliy lot
no
Description: The proposed asphalt pavement and CDL (Commerical Driving License) lot shall be approx. 173,000 SF located at inside ex. SMF lot. The scope of services includes, survey, geotechnical investigation, lighting analysis, preparation of design plans, specifications, construction documents, cost estimates and perform construction administration.
12/28/2017
Black & Veatch Corporation
City of Las Vegas
Rancho Dr Sewer Rehabilitation, Oakey Blvd to Pinto Ln
no
Description: Repair or replace approximately 4,700 feet of 45 inch RCP sewer pipe and eight (8) manholes between Rancho Drive and Pinto Lane in Las Vegas, NV
12/28/2017
MWH Americas, Inc.
City of Las Vegas
CLV Wastewater Collection System Master Plan Update 2018
no
Description: Provide recommendation for the expansion of the city system to meet the infrastructure requirement for existing and future services in Las Vegas, NV
12/28/2017
Stanley Consultants, Inc.
City of Las Vegas
Gowan North - El Capitan Branch, Ann Road to Centennial Parkway
no
Description: Design of a 78" reinforced concrete pipe storm drain and 7' x 6' to 10' x 8' concrete reinforced box culverts associated collection facilities along El Capitan Way from Ann Road to Centennial Parkway in Las Vegas, NV
01/05/2018
Odyssey Engineering
Washoe County School District
2018 Master Planning
no
Description: Spanish Springs MS - Proposal for surveying services base mapping and topographical survey - WCSD Spanish Springs APN: 083-024-25
01/04/2018
Black Eagle Consulting, Inc.
City of Sparks
Silverton Shores Park
no
Description: Provide materials testing and inspection services as needed for the construction of Silverton Shores Park.
01/03/2018
CM Works, Inc.
Clark County Public Works
Northern Clark County 215 Bruce Woodbury Beltway
no
Description: Improvements to the CC215 Bruce W Beltway from N 5th Street to UPRR Bridge. Including two through lanes, auxiliary lanes between ramps, drainage, lighting, bridge structures, traffic signals, signing and striping for a controlled freeway access. CM Works will provide construction management services on the project as a representative of Clark County Public Works.
01/03/2018
Odyssey Engineering
Washoe County School District
2018 Grounds FCIS Repairs
no
Description: Hug HS - Professional landscaping design services for irrigation and turf improvement for the baseball field
12/26/2017
Hazard Management Services
Washoe County School District
Fund 40 - Scheduled Projects (Safety Projects)
no
Description: Moss ES and Winnemucca ES - Oversignt services for disturbance of lead containing roof paneling during the installation of snow guard (ice dams/snow fences)
12/26/2017
Pezonella Associates, Inc.
Washoe County School District
Fund 40 - Schedule Projects
no
Description: Bennett ES, Pleasant Valley ES, and Picollo School - professional services to conduct required special inspection and construction testing