Archive for April 2018

Awarded Public Works Projects

Following are notices sent out through the PAL Council. This posting requirement is in SB 268 and is required by the statute effective Oct 1, 2011. Posting of awarded projects is for all public works projects, not just those that have been awarded to firms certified to receive local preference.

Posting of Awarded Public Works Projects by Nevada Government Entities.

Download the Nevada Government Entity Filing of Awarded Public Works Projects for Posting on Board Website form. The government entity will complete this form to have its awarded public works project(s) posted on the Nevada Board of Professional Engineers and Land Surveyors website.

This posting is required by NRS 338, per the 2011 Legislative Session SB 268. Once a completed form is received by the Nevada Board of Professional Engineers and Land Surveyors staff, the awarded project information will be posted on this award page.

Date
Company
Agency Name
Project
Preference
04/26/2018
DC Engineering
Washow County School District
Arrow Creek MS Design
no
Description: Electrical and gas infrastructure design
04/26/2018
JP Engineering
Washoe County School District
Arrow Creek MS Design
no
Description: Fire protection evaluation
04/25/2018
Turpin & Rattan Engineering, Inc.
Clark County
111-17-032 TI Penthouse Refurbishment
no
Description: Design/Engineering services associated with the TI Penthouse Refurbishment project at McCarran International Airport.
04/18/2018
Nichols Consulting Engineers (NCE)
Washoe County
Lower Wood Creek Phase 1 Water Quality Improvement Project
no
Description: Professional engineering services for the planning, permitting and preliminary design phase of the project. First phase includes: project management & coordination, existing conditions PLRM and planning, Feasibility report, public outreach & initial permitting and NEPA categorical exclusion.
04/17/2018
Pezonella Associates
Washoe County School District
McQueen HS - ADA Toilet Room Inspections
no
Description: Special inspections and material testing for ADA Flooring project for McQueen HS. Project Description - Provide the services for which the design professional(s) were selected. Attached extra sheet(s) if required.
04/12/2018
Wood Rodgers
Truckee Meadows Water Authority
STMGID Conjunctive Use Arrowcreek
no
Description: Geotechnical and materials testing. Project Description - Provided the services for which the design professional(s) were selected. Attached extra sheet(s) if required.
04/11/2018
Bigby and Associates, Inc.
Truckee Meadows Water Authority
Mesa Park Boundary Line Adj.
no
Description: Field surveys, Mapping and Document Prep. Project Description - Provide the services for which the design professional(s) were selected. Attached extra sheet(s) if required.
04/11/2018
Pazonella & Assoc.
Washoe Count School District
Huffaker ES single point entry addition
no
Description: Single Point entry - special Inspections. Project Description - Provide the services for which the design professional(s) were selected. Attached extra sheet(s) if required.
04/11/2018
Pazonella & Assoc.
Washoe Count School District
Hidden C=valley single point entry addition
no
Description: Single point entry - special Inspections. project Description - Provide the services for which the design professional(s) were selected. Attached extra sheet(s) if required.
04/11/2018
Pazonella & Assoc.
Washoe County School District
Brown ES single point entry addition
no
Description: Single Point entry - special Inspections. Project Description - Provide the services for which the design professional(s) were selected. Attached extra sheet(s) if required.
04/11/2018
Construction Materials Engineers Inc.
Washoe County School Distrct
Verdi ES Watermain Extension
no
Description: Site geotechnical Investigation. Project description - Provide the services for which the design professional(s) were selected. Attached extra sheets(s) if required.
04/10/2018
Dyer Engineering
Truckee Meadows Water Authority
Foothill Road Pump Station
no
Description: Engineering & Planning Services for Feasibility Analysis Project Description - Provide the services for which the design professional(s) were selected. Attached extra sheet(s) if required.
04/04/2018
ETC Group, LLC
Clark County
2457 Central Plant 1 Optimization
no
Description: Energy audit. Project Description - Provide services which the design professional(s) were selected. Attached extra sheet(s) if required.
04/03/2018
Battle Born Ventures
City of Sparks
Survey for 2018 Unit 1 Street Rehab Project
no
Description: Provide survey work for roadway reconstruction project, FY18 Unit 1 Street Rehabilitation Project. Project Description - Provide the services for which the design professional(s) were selected. Attached extra sheet(s) if required.
03/21/2018
PK Electrical Inc.
Truckee Meadows Water Authority
Verdi Business Park Tank 2
no
Description: TTHM Formation Mitigation Project Description - Provide the services for which the design professional(s) were selected. Attached extra sheet(s) if required.
04/02/2018
Benchmark, Inc.
Washoe County School District
Roofing FCIS 2019 Allocation: District Wide
no
Description: Preform detailed roofing assessment of 33 WCSD facilities. Project Description - Provide the services for which the design professional(s) were selected. Attached extra sheet(s) if required.