Archive for August 2019

Awarded Public Works Projects

Following are notices sent out through the PAL Council. This posting requirement is in SB 268 and is required by the statute effective Oct 1, 2011. Posting of awarded projects is for all public works projects, not just those that have been awarded to firms certified to receive local preference.

Posting of Awarded Public Works Projects by Nevada Government Entities.

Download the Nevada Government Entity Filing of Awarded Public Works Projects for Posting on Board Website form. The government entity will complete this form to have its awarded public works project(s) posted on the Nevada Board of Professional Engineers and Land Surveyors website.

This posting is required by NRS 338, per the 2011 Legislative Session SB 268. Once a completed form is received by the Nevada Board of Professional Engineers and Land Surveyors staff, the awarded project information will be posted on this award page.

Date
Company
Agency Name
Project
Preference
08/30/2019
DLR Group
Las Vegas Metropolitan Police Dept.
Range 5 Improvements
no
Description: Improvements to firearms range to include construction of CMU wall, shade structure, concrete work ans target bases.
08/28/2019
Westwood dba Slater Hanifan Group
Clark County
CC 215 Beltway from Tropicana Ave to Charleston Blvd
no
Description: Lane addition on CC-215 from Tropicana Ave. to Charleston Blvd Realignment of the southbound exit ramp right turn lane at Flamingo. Traffic signal modification, bridge widening at Summerlin Center Dr; drainage at Flamingo; utility coordination evaluate lane addition at Charleston northbound exit ramp.
08/30/2019
Louis Berger U.S Inc
Clark County
Flamingo Wash from Maryland to Palos Verde Street
no
Description: Channel improvements on Flamingo Wash from Maryland to Palos Verde Street. Such improvements are identified in the Clark County Regional Flood Control District (CCRFCD) Master Plan Update as Lower Flamingos facilities FLWA 0621 and FLWA 0673 improvements are to include channel installation with trapezoidal and/or rectangular cross section.
08/27/2019
Westwood dba Slater Hanifan Group
Clark County
Fort Apache Road - Blue Diamond Road to Warm Springs Road
no
Description: Design of roadway improvements on Fort Apache Road between Blue Diamond Road and Warm Springs Road, which will include additional lanes in each direction, storm-drain rehabilitation, traffic control improvements, pavement markings, street lighting pavement rehabilitation, sidewalks, as well as curb and gutters.
08/26/2019
Lumos and Associates, Inc.
City of Fernley
Cottonwood Lane Drainage and Roadway Reconstruction Project
no
Description: Scope of work generally includes: reconstruct a portion of the street between Cook Way and a portion of the street from US-95A to Hardie Lane, ADA, drainage, striping/signage improvements through out the corridor, installation of approximately 650 LF of 18' waterline and replacement of approx 1,100 FL 6' waterline. May include sewer/water stubs to areas of future use.
08/23/2019
Brown and Caldwell
City of Reno
TMWRF Digester 2 Cover Rehabilitation Project
no
Description: The project includes construction management services to support the removal and replacement of sludge sample pipes, cleaning and coating of the interior of the digested cover, removal and reinstallation/replacement of concrete ballast blocks, lead abatement, removal and replacement of the polyurethane foam insulation on the exterior of the cover, and installation of a new elastomeric digester seal.
07/23/2019
Wood Rodgers
City of Las Vegas
Downtown Wayfinding Signs
no
Description: Roadway engineering design of Downtown Wayfinding signs in Las Vegas, NV
08/22/2019
Headway Transportation
Carson City
Southwest Carson City Circulation Study
no
Description: The approach ti improve overall traffic circulation, enhance redevelopment, and encourage business activity in the southwest portion of Carson City.
08/14/2019
VTN Nevada
Clark County
Russel Road and Hacienda Avenue Reconstruction
no
Description: Roadway resurfacing and related improvements on the following roads: Russell Road from Stephanie Street to 100 West of Boulder Falls Street and Hacienda Avenue from Nellis Boulevard to Stephanie Street.
08/14/2019
HDR Engineering Inc.
Clark County
Jones Boulevard, I-215 to Tropicana Ave
no
Description: Improvements to include pavement rehabilitation, addition of raised medians with left turn lanes at designed intersections, installation/replacement of traffic signs as necessary removal and replacement of existing substandard ADA curb ramps, traffic signal modifications at existing signalized intersections, installation of traffic signal undergrounds, and some drainage inlet adjustments.
08/22/2019
Westwood Professional Services, Inc.
Clark County
Blue Diamond Wash and Wagon Trail Channel Improvements
no
Description: Blue Diamond Wash and Wagon Trail Channel storm drain improvements as delineated below: - Blue Diamond Wash Improvements from Arville Street to 1-15, and - Wagon Trial Channel Improvements from Sunset Road to Teco Avenue.
09/09/2019
CA Group, Inc.
Clark County
Cactus Avenue, from Apache Road to Buffalo Drive
no
Description: Roadway asphalt concrete pavement providing of four (4) travel lanes, two (2) bike lanes and buffer zones, a two-way left-turn lane with raised medians, storm drainage facilities, curbs, gutters, sidewalks, bridge structure over existing MPU facility, street lighting traffic signals, intelligent traffic system (ITS) conduit and/or fiber optic system.
08/19/2019
Lumos & Associates
Regional Transportation Commission of Washoe County
Golden Valley Road Rehabilitation Project
no
Description: Rehabilitate Golden Valley Road from Yorkshire Dr to N Virginia St including sidewalk, curb and gutter replacement as necessary. The consultant will preform certain engineering design, construction management, and quality assurance services.
08/12/2019
Lumos and Associates
Carson City
3rd Street Parking
no
Description: Lumos and associates will provide geotechnical services for upgrades to be made to the 3rd Street Parking lot
08/12/2019
Farr West Engineering
City of Reno
TMWRF MCC 7, 8, & 9 Construction Management
no
Description: Construction management includes Project Management and Construction Administration.
07/29/2019
AECOM
City of Reno
RSP Switchgear and LVDC-1A Switchboard Rehab Design
no
Description: Design includes project management and associated design services
08/08/2019
Kimley-Horn and Associates, Inc.
City of Sparks
Fire Station 1-HVAC and Electrical Feasibility Study
no
Description: Provide mechanical and electrical study to replace the existing HVAC system at Fire Station 1 and upgrade the electrical emergency system.
08/06/2019
Wood Rodgers
Washoe County School District
Cold Springs ES Entitlement Services
no
Description: Assistance with applying for a special use permit
08/06/2019
SB Engineering
Truckee Meadows Water Authority
2020 Plumas-Urban 1 & 2 Reconstruction Project
no
Description: Engineering services for annual PRS rehab
08/05/2019
Converse Consultants
Clark County
Asbestos Containing Material Abatement at A & B Concourse
no
Description: Removal of all asbestos-containing structural fire-protecting under the A & B concourses and replace with non-asbestos fireproofing.