Archive for October 2019

Awarded Public Works Projects

Following are notices sent out through the PAL Council. This posting requirement is in SB 268 and is required by the statute effective Oct 1, 2011. Posting of awarded projects is for all public works projects, not just those that have been awarded to firms certified to receive local preference.

Posting of Awarded Public Works Projects by Nevada Government Entities.

Download the Nevada Government Entity Filing of Awarded Public Works Projects for Posting on Board Website form. The government entity will complete this form to have its awarded public works project(s) posted on the Nevada Board of Professional Engineers and Land Surveyors website.

This posting is required by NRS 338, per the 2011 Legislative Session SB 268. Once a completed form is received by the Nevada Board of Professional Engineers and Land Surveyors staff, the awarded project information will be posted on this award page.

Date
Company
Agency Name
Project
Preference
10/29/2019
NOVA Geotechnical & Inspection Services
City of Las Vegas
Blanket Contract - Geotechnical Investigation (Design)
no
Description: Blanket contract for geotechnical services for the City of Las Vegas
10/29/2019
GeoTek, Inc.
City of Las Vegas
Blanket Contract - Geotechnical Investigation (Design)
no
Description: Blanket contract for geotechnical services for the city of Las Vegas
10/29/2019
Poggemeyer Design Group, Inc.
City of Las Vegas
215 Pedestrian Trial Bridges at Summerlin Parkway and Lake Mead Boulevard
no
Description: Roadway engineering design of 215 Pedestrian Trail Bridges at Summerlin Parkway and Lake Mead Boulevard in Las Vegas, NV.
10/29/2019
Kimley-Horn
City of Las Vegas
Imperial Avenue, Commerce to 3rd
no
Description: Roadway engineering design of Imperial Avenue, Commerce to 3rd in Las Vegas
10/30/2019
Lloyd Consulting Group
Washoe County School District
McQueen HS Turf Replacement
no
Description: Project design, bid assistance and construction administration
10/29/2019
Kleinschmidt Associates
Truckee Meadows Water Authority
Chalk Creek/Orr Ditch Hydroelectric Facility
no
Description: Provide support in assisting with the development of the Orr Ditch powerhouse project.
10/30/2019
CME Engineers Inc.
Washoe County School District
Geotechnical Investigation
no
Description: Geotechnical services for O'Brien MS rebuild project
10/29/2019
Alta Survey, LLC dba Alta Nevada
Clark County
Erie Pedestrian Bridge - Rainbow Blvd to Windy Desert St
no
Description: Improvements include concrete path, bollards, and barricades: grade-separated pedestrian crossing over UPRR tracks including prefabricated steel truss bridge, cast-in-place concrete bridge spans, concrete bridge piers and abutments, and at-grade pedestrian crossing at Rainbow Blvd including pedestrian flashers, signage, striping, and sidewalk ramp modification.
10/28/2019
Farr West Engineering
City of Reno
Swan Lake De-Watering Project
no
Description: The project includes construction management services to support the install of a pump, intake system, approximately 34,000 linear feet of HDPE overland pipe and irrigation pivots.
10/28/2019
Kimley-Horn and Associates
City of Sparks
Fire Station 1 Boiler Piping Mechanical Improvements Design
no
Description: Provide mechanical improvements design for Fire Station 1 cooling tower and boiler piping systems.
10/25/2019
Kimley-Horn & Associates
Regional Transportation Commission of Washoe County
Kuenzli St Conversion Project
no
Description: Conversion of Kuenzli St from one way to two way via pavement maintenance and new striping. Traffic signal modifications will be included based on striping setup.
10/23/2019
Henderson Engineers
Las Vegas Convention and Visitor's Authority
Central Plant Boiler Retrofit Design
no
Description: Provide mechanical, electrical, pluming, and architectural designs for the demolition and replacement of the three (30 Central Plant Boilers to used in Public Works Bid.
10/23/2019
Henderson Engineers
Las Vegas Convention and Visitor's Authority
Cooling Towers Fill Replacement Wall Design
no
Description: Provide mechanical and electrical designs for the demolition and replacement for the fill replacement of eight (8) cooling towers.
10/23/2019
NCE
City of Sparks
Technical Support for Updating PAVER
no
Description: Provide technical support to the City of Sparks in upgrading our PAVER data base and shape files for newly accepted streets
10/22/2019
Kleinschmidt Associates
Truckee Meadows Water authority
Washoe Turbine Refurbished Study
no
Description: Field inspection and engineering assessment to determine a scope of refurbishment for Washoe Powerhouse turbines
10/22/2019
Kleinschmidt Associates
Truckee Meadows Water Authority
Verdi Bypass Valve Replacement Assessment
no
Description: Analysis to determine if the Verdi turbine bypass valve should be replaced or abandoned
10/22/2019
Kleinschmidt Associates
Truckee Meadows Water Authority
Fleisch Turbine Repair Study
no
Description: Design repairs for the Fleisch powerhouse turbine
10/22/2019
UNVC
Washoe County School District
Palmer Chiller System
no
Description: Commissioning, testing, and reporting of the install of the new mechanical, plumbing and electrical components for the chiller system
10/22/2019
Wood Rodgers
Washoe County School District
Wild Creek Orr Ditch Improvements
no
Description: Engineering during construction
10/22/2019
Kimley-Horn & Associates
Regional Transportation Commission of Washoe County
TE Spot 9 - Package 2
no
Description: New traffic signal at the intersection of Rock Blvd/Edison Way. Upgrade various traffic signal equipment at 19 intersections around Reno. Intersection study at W. 4th St at Mesa Park/Woodland
10/22/2019
Lumos and Associates
Carson City
CDBG College Parkway ADA Testing Services
no
Description: The project consists of construction of ADA complaint driveways and curb ramps on College Parkway between Carson Street and Northgate Lane in Carson City, Nevada. Lumos and Associates will provide testing services.
10/22/2019
Wood Rogers Inc.
Truckee Meadows Water Authority
Spanish Springs Main Replacement
no
Description: Design assistance for the replacement of substandard PVC pipes located in the Sky Ranch North subdivision in Spanish Springs to include agency coordination, survey and mapping, development of design drawings, permitting assistance, and bidding support services.
10/15/2019
Kleinfelder, Inc
Clark County
Staff Augmentation for QA/IA Testing
no
Description: Professional Services Contract for Quality Assurance/Independent Assurance Testing and Inspection of Public Works Projects.
10/15/2019
Wood Rodgers
Washoe County School District
Wild Creek Orr Ditch Improvements
no
Description: Testing and special inspections
10/15/2019
Poggemeyer Design Group
Washoe County School District
Water main Extension at Verdi ES
no
Description: Water main extension construction management design review, pre-construction meetings
10/14/2019
Petty & Associates
Truckee Meadows Water Authority
Mt. Rose 5 Well Improvements
no
Description: Design HVAC improvements and additions for the main booster pump room and bleach room
10/11/2019
Lochsa Surveying
Clark County
Alexander Rd. Pecos - Puebla & Pebble Rd Eastern - Pecos
no
Description: Pavement rehabilitation on Alexander Road and Pebble Road, raised medians, ADA improvements, replacement of damaged curb gutter and sidewalk, traffic control devices, upgrade existing streetlight luminaries to L.E.D improvements also include removal and replacement of existing RCB under Alexander Road with connecting storm drain systems and drop inlets.
10/14/2019
Aztech Inspection & Testing, LLC
Clark County
Staff Augmentation for QA/IA Testing
no
Description: Professional services contract for quality Assurance/Independent Assurance Testing and inspection of Public Works Projects.
10/10/2019
Diversified Consulting Services
City of Las Vegas
Blanket Contract - Construction Management and staff augmentation
no
Description: Blanket Contract - Construction Management and staff augmentation for various projects for the City of Las Vegas
10/10/2019
D3 Inc.
City of Las Vegas
Municipal Court Technology
no
Description: Technology for the Municipal Court for the City of Las Vegas
10/10/2019
Horrocks Engineering
City of Las Vegas
8th Street, Stewart to Bridger
no
Description: Roadway engineering design of 8th Street, Stewart to Bridger in the City of Las Vegas
10/10/2019
CA Group, Inc.
City of Las Vegas
Blanket Contract - Construction Management & Staff Augmentation
no
Description: Blanket Contract - Construction Management & Staff Augmentation for various projects for the City of Las Vegas
10/08/2019
Etchemendy Engineering
Washoe County School District
McQueen HS Hot Water Removal
no
Description: Provide updated plans for previously designed project (hot water removal and replacement) cost estimate, construction schedule and CA
10/07/2019
Dyer Engineering
City of Sparks
Tyler Way & 18th St Sanitary Sewer Replacement
no
Description: Engineering design and plans for Sanitary Sewer replacement project.
10/07/2019
Axion Engineering
City of Sparks
Wingfield Hills Storm Drain Improvements
no
Description: Engineering design and plans for a storm Drain improvements project.
10/07/2019
Atkins
City of Sparks
Prater & Vista Storm Drain Improvements
no
Description: Engineering design and plans for a Storm Drain improvements project.
10/07/2019
Odyssey Engineering Inc.
City of Sparks
Rockwood & Glen Meadow Storm Drain Improvements
no
Description: Engineering design and plans for Storm Drain improvements project.
10/07/2019
Farr West Engineering
City of Sparks
Stanford Way Sanitary Sewer - CIPP Lining
no
Description: Engineering design and plans for Sanitary Sewer Cast in Place Pipe (CIPP) lining project
10/02/2019
Pk Electrical
Carson City
Electrical Engineering Services for the downtown redevelopment
no
Description: PK Electrical is providing electrical engineering services for some downtown improvements including design of electrical services at the 3rd street parking lot, undergrounding of overhead power line on Curry between 5th and Musser, and replacement of existing gas lamps with electric street lights on Curry between 5th and Musser
10/04/2019
JP Engineering
Truckee Meadows Water Authority
Mt. Rose 5 Well Improvements
no
Description: Electrical engineering design for proposed addition of a booster pump and HVAC to Mt. Rose Well #5
10/04/2019
Stantec Consulting Services, Inc.
City of Sparks
2020 Regional Trial Replacement Project
no
Description: Provide engineering services for the 2020 Regional Trail Replacement Project: between Kiley Parkway and Sparks Blvd.
10/03/2019
Farr West Engineering
Truckee Meadows Water Authority
Toll Rd and Glendale Diversion Portage Improvement Project
no
Description: Mapping, easement, and boundary line surveying services.
10/03/2019
Brown and Caldwell
City of Reno
2019 CIPP Rehabilitation Project
no
Description: Cured-in-place lining of sanitary sewer (SS) pipes and coating of SS manholes in various parts of Reno,NV.
09/27/2019
MBA Architecture and Interior Design
City of Reno
Public Safety Center
no
Description: This award is for design and construction administration services for the improvements necessary to renovate the property at 955 Kuenzli Street to be the City of Reno's new Public Safety Center. The Public Safety Center project will consolidate police head quarters, evidence storage, and emergency dispatch into facility.
09/30/2019
Black Eagle Consulting
Carson City
Pete Livermore Sports Complex Geotech Study
no
Description: Black Eagle Consulting will be conduct in a geotechnical study of the current parking lot at the Pete Livermore Sports Complex. The geotech study will consist of coring and testing of the existing pavement and provide Carson City with repair recommendations.