Awarded Projects

Awarded Public Works Projects

The Board is required to post certain information related to all public works projects awarded by Nevada government agencies. This requirement is detailed in Nevada Revised Statute 338, resulting from the 2011 Nevada Legislative Session, Senate Bill 268. After the government agency completes the form and emails it to the Board, the awarded project information will be posted on this page. Click here for the form.

Date
Company
Agency Name
Project
Preference
05/20/2020
SB Engineering
Truckee Meadows Water Authority
Wilson, Stewart, Moran & Roberts Main Replacements
no
Description: Engineering design and services
05/15/2020
VTN Nevada
Clark County
Fort Apache Road, Alexander Road to CC-215
no
Description: Improvements include removal and placement of new asphalt pavement, 1-inch UTACS, curb, gutter, sidewalk, sidewalk ramps, valley gutters, new storm drain SD inlets. R&R signage, pavement markings, vertical relocation of surface utilities, relocation of utilities, SL system, modify existing street lights, ITS system, TS mods, TS underground infrastructure, landscape improvements.
05/18/2020
Farr West Engineering
Truckee Meadows Water Authority
Vista 3 BPS/ HV Wells 3&4/ Glendale Portage
no
Description: Mapping & surveying services
05/18/2020
Jacobs Engineering Group, Inc.
City of Reno
TMWRF MCC 24 & 12 Replacement Project
no
Description: The project includes the pre-design for the rehabilitation of the TMWRF Effluent Reuse Pump Station. This includes a basis of design report and recommendations for improvements including a new building, surge analysis and improvements, and electrical upgrades as necessary for a comprehensive design.
05/18/2020
Black Eagle Consulting, Inc.
City of Sparks
2020 CDBG Reconstruction Project - Material Testing
no
Description: Provide material testing for the 2020 CDBG Reconstruction Project - D St and 16th St
05/08/2020
APTUS
Las Vegas Convention and Visitors Authority
Fire Control Room and Dispatch
no
Description: Prepare plans for tenant improvements for the Fire Control Room and Dispatch areas for LVCCD expansion, Phase 2
05/14/2020
Manhard Consulting
Carson City
Tenth and Curry Water Main Extension
no
Description: Provide a topographic survey of the full width of S. Curry Street from E. Ninth Street, south approximately 850-feet and an area approximately 30-feet wide area approximately 30-foot wide between APN 003-063-05 and APN 003-063-06 from S. Curry Street east to S. Carson Street.
05/14/2020
Kimley-Horn and Associates
Clark County
Hollywood Blvd. from Lake Mead Blvd to Chyenne Ave.
no
Description: Design Engineering services for improvement plans to resurface from Hollywood Blvd to Lake Mead Blvd to Chyenne Ave. Includes pavement, bike lanes, striping, signing, ADA upgrades as needed, streetlight upgrades to LED, traffic signal modifications, ITS facilities, drainage facilities and appurtenances as needed.
05/14/2020
CFA, Inc.
City of Sparks
2020 CDBG Reconstruction Project - Construction Staking
no
Description: Provide construction staking for the 2020 2020 CDBG Reconstruction Project Dst & 16th st
05/11/2020
Construction Materials Engineers
Carson City
District. 2 - Northridge Pavement Reconstruct
no
Description: Geotechnical Services for Northridge Drive Reconstruction
05/08/2020
SB Civil Engineering
City of Reno
TMWRF Effluent Reuse Pump Station Hydraulic Model Calibration
no
Description: The project includes the creation of the City of Reno Effluent Reuse Hydraulic Model and Calibration of the TMWRF Effluent Pump Station Hydraulic Model as it applies to surge analysis.
04/27/2020
CA Group, Inc
Clark County
Russell Road - Cimarron Road to Rainbow Boulevard
no
Description: Removal of existing asphalt concrete pavement, placement of hot mix asphalt concrete pavement, UTACS for four travel lanes, turn lanes, raised medians, storm drainage facilities, curbs, gutters, asphalt SWs, ADA complant SW ramps, valley gutters, & new upgrade SL Lums to LED, traffic signals, utility modifications, traffic control devices, pavement markings, intersecting streets.
05/07/2020
Lumos & Associates
City of Reno
TMWRF AC Paving Phase I - Admin to Dewatering Project
no
Description: The project includes the design for the replacement of pavement between the admin and the dewatering building, along with improved drainage and demolition of wastewater infrastructure, and development of plans and specifications for bidding and bidding assistance.
05/07/2020
Brown and Caldwell
City of Reno
TMWRF Digester #4 Rehabilitation Cover Alternative TM
no
Description: The project includes the pre-design and analysis of different digester covers as well as a life cycle cost for each alternative a recommendation.
05/06/2020
J&A Design Studio
City of Sparks
Sparks Marina All Abilities Playground Design
no
Description: Design all abilities playground to replace existing playground at the Sparks Marina Park.
05/01/2020
Adkins North America
Regional Transportation Commission of Washoe County
Sparks Blvd Project
no
Description: The design professional was sselected to provide certian environmental, engineering, and final design services in connection with the roadway widening of Sparks blvd from Greg street to Baring Bld in Sparks, Nevada.
04/29/2020
GCW
City of Las Vegas
Charleston Storm Drain - Essex to Lindell
no
Description: Flood control enigneering design of Charleston Storm Drain - Essex to Lindell for the city of Las Vegas
04/29/2020
Louis Berger US, Inc
City of LAs Vegas
Vegas Storm Drain - Shadow Mountain to Jones
no
Description: Flood Control Engineering design of Vegas Storm Drain - Vegas Storm Drain - Shadow Mountain to Jones for the city of Las Vegas
04/29/2020
Atkins North America
City of Las Vegas
Stewart storm Drain - Las Vegas Wash to Lamb
no
Description: Flood control engineering design of Stewart Storm Drian - Las Vegas Wash to LAmb for the city of Las Vegas
04/29/2020
4leaf Consulting, LLC
City of Las Vegas
Sewer Rehab Group J
no
Description: Construction Management - engineering of group sewer J for the city of Las vegas
Previous Page Next Page