Date

04/15/2025

Company

Odyssey Engineering, Inc.

Agency Name

Washoe County School District

Project

Surveying Services (Near) Mathews ES

Preference

No
Provide boundary line adjustment for potential ownership of a portion of a parcel owned by City of Reno @ Paradise Park for Mathews ES.

Date

04/14/2025

Company

Black Eagle Consulting

Agency Name

Washoe County School District

Project

Structural Repairs at Mendive MS

Preference

No
Provide special inspections during construction.

Date

04/11/2025

Company

DOWL

Agency Name

City of Sparks

Project

Sewer Study Business Impact Statement Assistance

Preference

No
Professional services to assist on the Business Impact Statement for the sewer rate study.

Date

04/09/2025

Company

Lumos & Associates

Agency Name

Truckee Meadows Water Authority

Project

E, H, 18th & 19th Water Main Replacements

Preference

No
Material Observation and Testing E, H, 18th & 19th Water Main Replacements

Date

04/09/2025

Company

Nelson Wilcox Structural Engineers

Agency Name

Truckee Meadows Water Authority

Project

Chalk Bluff Screening Facility Improvements

Preference

No
Chalk Bluff Screening Slide Gate Replacements – Structural Design

Date

04/08/2025

Company

Nelson Wilcox Structural Engineers

Agency Name

Truckee Meadows Water Authority

Project

Goldnenrod Main

Preference

No
Structural design for vault lid replacement

Date

04/02/2025

Company

Construction Materials Engineers, Inc.

Agency Name

Truckee Meadows Water Authority

Project

Talus Valley Booster Pump Station

Preference

No
Special Inspection and Material Testing for the rough grading of the Talus Valley Booster Pump Station site.

Date

04/01/2025

Company

Verus Associates Nevada

Agency Name

Truckee Meadows Water Authority

Project

Boomtown System Improvements Ph 2

Preference

No
Electrical design and construction support.

Date

03/31/2025

Company

HDR

Agency Name

City of Reno

Project

FEMA Flood Risk Map Update/Revision

Preference

No
The project will complete the analysis, reporting, and mapping for a revision to the Federal Emergency Agency (FEMA) Special Flood Hazard Area for areas of South Reno.

Date

03/31/2025

Company

J-U-B

Agency Name

City of Reno

Project

Water’s Edge Truckee River Bank Stabilization

Preference

No
The south bank of the Truckee River has eroded over time between the Booth St. and Keystone Ave. Bridges. This project will assess the current condition of the riverbank to quantify the extent of erosion and determine and design appropriate stabilization measures.

Date

03/27/2025

Company

Manhard Consulting

Agency Name

Washoe County School District

Project

Verdi ES Gutter Replacement

Preference

No
Design and assist with bidding for the new gutters, as well as any other components the owners deem necessary.

Date

03/26/2025

Company

Consor Engineers, LLC

Agency Name

City of Reno

Project

2025 Sewer CIPP Rehabilitation Project

Preference

No
Construction Management services including inspection, meeting coordination, project oversight, conflict resolution, and materials testing. Project consists of CIPP lining of approximately 18,000 linear feet of sewer main varying from 8″ – 12″.

Date

03/26/2025

Company

Jacobs Engineering

Agency Name

City of Las Vegas

Project

Blanket Contract for Wastewater Pollution Control Facility (WPCF) Air Quality Compliance and Permitting

Preference

No
Blanket contract for National Environmental Policy Act (NEPA) services for Wastewater Pollution Control Facility (WPCF) Air Quality Compliance and Permitting

Date

03/26/2025

Company

Jacobs Engineering Group Inc

Agency Name

City of Reno

Project

TMWRF Backup Power & Resiliency Project

Preference

No
This project includes professional engineering services to assess the Truckee Meadows Water Reclamation Facility’s (TMWRF’s) existing power system, current and future energy demands, and provide recommended solutions for new backup power systems.

Date

03/20/2025

Company

House Moran Consulting, Inc.

Agency Name

City of Sparks

Project

City of Sparks – Update Proposal for IFSA #1 CIP

Preference

No
Engineering services and administrative services to assist the City of Sparks with methodology in updating the Impact Fee Service Area #1 Capital Improvement Plan Update.

Date

03/20/2025

Company

Construction Materials Engineers, Inc.

Agency Name

Truckee Meadows Water Authority

Project

Stampmill PFAS Mitigation

Preference

No
Geotechnical services for TMWA Stampmill PFAS Treatment Project

Date

03/20/2025

Company

Lumos & Associates

Agency Name

Truckee Meadows Water Authority

Project

FY 2026 Pavement Maintenance

Preference

No
Pavement preservation, PCI inspections