Awarded Projects

Awarded Public Works Projects

The Board is required to post certain information related to all public works projects awarded by Nevada government agencies. This requirement is detailed in Nevada Revised Statute 338, resulting from the 2011 Nevada Legislative Session, Senate Bill 268. After the government agency completes the form and emails it to the Board, the awarded project information will be posted on this page. Click here for the form.

Date
Company
Agency Name
Project
Preference
10/22/2019
Kleinschmidt Associates
Truckee Meadows Water authority
Washoe Turbine Refurbished Study
no
Description: Field inspection and engineering assessment to determine a scope of refurbishment for Washoe Powerhouse turbines
10/22/2019
Kleinschmidt Associates
Truckee Meadows Water Authority
Verdi Bypass Valve Replacement Assessment
no
Description: Analysis to determine if the Verdi turbine bypass valve should be replaced or abandoned
10/22/2019
Kleinschmidt Associates
Truckee Meadows Water Authority
Fleisch Turbine Repair Study
no
Description: Design repairs for the Fleisch powerhouse turbine
10/22/2019
UNVC
Washoe County School District
Palmer Chiller System
no
Description: Commissioning, testing, and reporting of the install of the new mechanical, plumbing and electrical components for the chiller system
10/22/2019
Wood Rodgers
Washoe County School District
Wild Creek Orr Ditch Improvements
no
Description: Engineering during construction
10/22/2019
Kimley-Horn & Associates
Regional Transportation Commission of Washoe County
TE Spot 9 - Package 2
no
Description: New traffic signal at the intersection of Rock Blvd/Edison Way. Upgrade various traffic signal equipment at 19 intersections around Reno. Intersection study at W. 4th St at Mesa Park/Woodland
10/22/2019
Lumos and Associates
Carson City
CDBG College Parkway ADA Testing Services
no
Description: The project consists of construction of ADA complaint driveways and curb ramps on College Parkway between Carson Street and Northgate Lane in Carson City, Nevada. Lumos and Associates will provide testing services.
10/22/2019
Wood Rogers Inc.
Truckee Meadows Water Authority
Spanish Springs Main Replacement
no
Description: Design assistance for the replacement of substandard PVC pipes located in the Sky Ranch North subdivision in Spanish Springs to include agency coordination, survey and mapping, development of design drawings, permitting assistance, and bidding support services.
10/15/2019
Kleinfelder, Inc
Clark County
Staff Augmentation for QA/IA Testing
no
Description: Professional Services Contract for Quality Assurance/Independent Assurance Testing and Inspection of Public Works Projects.
10/15/2019
Wood Rodgers
Washoe County School District
Wild Creek Orr Ditch Improvements
no
Description: Testing and special inspections
10/15/2019
Poggemeyer Design Group
Washoe County School District
Water main Extension at Verdi ES
no
Description: Water main extension construction management design review, pre-construction meetings
10/14/2019
Petty & Associates
Truckee Meadows Water Authority
Mt. Rose 5 Well Improvements
no
Description: Design HVAC improvements and additions for the main booster pump room and bleach room
10/11/2019
Lochsa Surveying
Clark County
Alexander Rd. Pecos - Puebla & Pebble Rd Eastern - Pecos
no
Description: Pavement rehabilitation on Alexander Road and Pebble Road, raised medians, ADA improvements, replacement of damaged curb gutter and sidewalk, traffic control devices, upgrade existing streetlight luminaries to L.E.D improvements also include removal and replacement of existing RCB under Alexander Road with connecting storm drain systems and drop inlets.
10/14/2019
Aztech Inspection & Testing, LLC
Clark County
Staff Augmentation for QA/IA Testing
no
Description: Professional services contract for quality Assurance/Independent Assurance Testing and inspection of Public Works Projects.
10/10/2019
Diversified Consulting Services
City of Las Vegas
Blanket Contract - Construction Management and staff augmentation
no
Description: Blanket Contract - Construction Management and staff augmentation for various projects for the City of Las Vegas
10/10/2019
D3 Inc.
City of Las Vegas
Municipal Court Technology
no
Description: Technology for the Municipal Court for the City of Las Vegas
10/10/2019
Horrocks Engineering
City of Las Vegas
8th Street, Stewart to Bridger
no
Description: Roadway engineering design of 8th Street, Stewart to Bridger in the City of Las Vegas
10/10/2019
CA Group, Inc.
City of Las Vegas
Blanket Contract - Construction Management & Staff Augmentation
no
Description: Blanket Contract - Construction Management & Staff Augmentation for various projects for the City of Las Vegas
10/08/2019
Etchemendy Engineering
Washoe County School District
McQueen HS Hot Water Removal
no
Description: Provide updated plans for previously designed project (hot water removal and replacement) cost estimate, construction schedule and CA
10/07/2019
Dyer Engineering
City of Sparks
Tyler Way & 18th St Sanitary Sewer Replacement
no
Description: Engineering design and plans for Sanitary Sewer replacement project.
Next Page