Awarded Projects

Awarded Public Works Projects

The Board is required to post certain information related to all public works projects awarded by Nevada government agencies. This requirement is detailed in Nevada Revised Statute 338, resulting from the 2011 Nevada Legislative Session, Senate Bill 268. After the government agency completes the form and emails it to the Board, the awarded project information will be posted on this page. Click here for the form.

Date
Company
Agency Name
Project
Preference
04/18/2018
Nichols Consulting Engineers (NCE)
Washoe County
Lower Wood Creek Phase 1 Water Quality Improvement Project
no
Description: Professional engineering services for the planning, permitting and preliminary design phase of the project. First phase includes: project management & coordination, existing conditions PLRM and planning, Feasibility report, public outreach & initial permitting and NEPA categorical exclusion.
04/17/2018
Pezonella Associates
Washoe County School District
McQueen HS - ADA Toilet Room Inspections
no
Description: Special inspections and material testing for ADA Flooring project for McQueen HS. Project Description - Provide the services for which the design professional(s) were selected. Attached extra sheet(s) if required.
04/12/2018
Wood Rodgers
Truckee Meadows Water Authority
STMGID Conjunctive Use Arrowcreek
no
Description: Geotechnical and materials testing. Project Description - Provided the services for which the design professional(s) were selected. Attached extra sheet(s) if required.
04/11/2018
Bigby and Associates, Inc.
Truckee Meadows Water Authority
Mesa Park Boundary Line Adj.
no
Description: Field surveys, Mapping and Document Prep. Project Description - Provide the services for which the design professional(s) were selected. Attached extra sheet(s) if required.
04/11/2018
Pazonella & Assoc.
Washoe Count School District
Huffaker ES single point entry addition
no
Description: Single Point entry - special Inspections. Project Description - Provide the services for which the design professional(s) were selected. Attached extra sheet(s) if required.
04/11/2018
Pazonella & Assoc.
Washoe Count School District
Hidden C=valley single point entry addition
no
Description: Single point entry - special Inspections. project Description - Provide the services for which the design professional(s) were selected. Attached extra sheet(s) if required.
04/11/2018
Pazonella & Assoc.
Washoe County School District
Brown ES single point entry addition
no
Description: Single Point entry - special Inspections. Project Description - Provide the services for which the design professional(s) were selected. Attached extra sheet(s) if required.
04/11/2018
Construction Materials Engineers Inc.
Washoe County School Distrct
Verdi ES Watermain Extension
no
Description: Site geotechnical Investigation. Project description - Provide the services for which the design professional(s) were selected. Attached extra sheets(s) if required.
04/10/2018
Dyer Engineering
Truckee Meadows Water Authority
Foothill Road Pump Station
no
Description: Engineering & Planning Services for Feasibility Analysis Project Description - Provide the services for which the design professional(s) were selected. Attached extra sheet(s) if required.
04/04/2018
ETC Group, LLC
Clark County
2457 Central Plant 1 Optimization
no
Description: Energy audit. Project Description - Provide services which the design professional(s) were selected. Attached extra sheet(s) if required.
04/03/2018
Battle Born Ventures
City of Sparks
Survey for 2018 Unit 1 Street Rehab Project
no
Description: Provide survey work for roadway reconstruction project, FY18 Unit 1 Street Rehabilitation Project. Project Description - Provide the services for which the design professional(s) were selected. Attached extra sheet(s) if required.
03/21/2018
PK Electrical Inc.
Truckee Meadows Water Authority
Verdi Business Park Tank 2
no
Description: TTHM Formation Mitigation Project Description - Provide the services for which the design professional(s) were selected. Attached extra sheet(s) if required.
04/02/2018
Benchmark, Inc.
Washoe County School District
Roofing FCIS 2019 Allocation: District Wide
no
Description: Preform detailed roofing assessment of 33 WCSD facilities. Project Description - Provide the services for which the design professional(s) were selected. Attached extra sheet(s) if required.
03/30/2018
Farr Wast Engineering
City of Reno
Central & South Reno Interceptor Capacity Project
no
Description: Construction Services installation of approximately 2,500 LF of interceptor sanitary sewer pipe in Kietzke/Linden Street Area. Project Description - Provide the services for which the design professional(s) were selected. Attached extra sheets(s) if required. Including but limited, construction management, construction inspection, construction survey and material testing
03/27/2018
Pezonella Associates, Inc.
Washoe County School District
Picollo K-12
no
Description: Special instruction and material testing services for the HVAC and ADA restroom project. Project Description - Provide the services for which the design professional(s) were selected. Attached extra sheet(s) if required.
03/27/2018
Construction Materials Engineers, Inc.
Washoe County School District
Reed HS
no
Description: Material testing for concrete, subgrade and rebar for the new concrete in the Courtyard at Reed HS Project Description - Provide the services for which the design professional(s) were selected. Attached extra sheet(s) if required.
03/27/2018
CM Works
Washoe County School District
Sun Valley Middle School
no
Description: Construction Administration Project Description - Provide the services for which the design professional(s) were selected. Attached extra sheet(s) if required.
03/27/2018
Pezonella Associates, Inc,
Washoe County School District
Sun Valley Middle School
no
Description: Materials testing and special inspection Project Description - Provide the services for which the design professional(s) were selected. Attached extra sheet(s) if required.
03/27/2018
Black Eagle Consulting, Inc.
Washoe County School District
Spanish Springs "Sky Ranch Middle School"
no
Description: Materials testing and special inspection Project Description - Provide the services for which the design professional(s) were selected. Attached extra sheet(s) if required.
03/27/2018
CM Works
Washoe County School District
Spanish Springs "Sky Ranch Middle School"
no
Description: Construction Administration Project Description - Provide the services for which the design professional(s) were selected. Attached extra sheet(s) if required.