Description: Roadway resurfacing, pavement reconstruction, &/or widening as needed to provide two lanes in each direction with wide shoulder. Construct medians, sidewalk, curb and gutter repair, adjust SW ramps to meet ADA. Utility relocation, manhole adjustments, drainage drop inlets & SD, Traffic improvements LED SLs, ITS fiber optic, striping, detector loops and new TS at Patrick.